Ask the building before choosing a time
Confirm the available moving window, service entrance, elevator reservation process, and any documents the building requests.
Measure the path, not only the room
Check the elevator, hallway turns, doorways, and the distance from the loading area to the unit.
- Freight-elevator dimensions
- Loading-zone time limits
- Protection required in common areas
Share the same instructions with everyone
Put building rules into the estimate request so the customer, coordinator, and crew work from one access plan.

